FAKTOR-FAKTOR RISIKO DESIGN AND BUILD YANG MEMPENGARUHI KESUKSESAN PROYEK REHABILITASI TOTAL GEDUNG PENDIDIKAN DI PROVINSI DAERAH KHUSUS IBUKOTA JAKARTA

Andi M. Tarigan, Abdullah Abdullah, Hafnidar A.Rani

Abstract


Implementation of projects with system design and build, faced with various risks. These risks include no supporting data such as geological maps, soil investigation data, basic design drawings, and environmental documents, and difficulties in measuring job performance. These risks, can affect the success of the project. The success of the project is marked by the budget conformity with the actual cost, the conformity of the time plan with the time of implementation, the quality in accordance with the specifications, and the satisfaction of the parties involved in the project. This study aims to analyze the relationship and influence between design and build risk factors on project success, as well as to identify the dominant factors in design and build risk that affect the success of the total educational building rehabilitation project in package 4 in DKI Jakarta Province. Package 4 includes 18 units of SDN buildings, and 2 units of SMP buildings. This study used qualitative methods quantized through questionnaires, where the respondents were directed to 30 Construction Management (MK), and 17 personnel owners with a total of 47 respondents. The design and build risk factors analyzed in this research are owner owner management factor, procurement process, planning ability, implementation capability, project manager capability, and project scope factor. Validity and reliability test results show all valid question items and reliable variables. The result of the research shows that the scope of the project has a very low relationship, ownership management ability factor, implementation ability and project manager capability have low relation, planning ability factor has enough relationship, and procurement process factor has high correlation to project success. The design and build risk factors all had a significant effect on the project's success of 69.8%. The dominant factor in design and build risk affecting project success is the procurement process factor. This indicates that if the procurement process factor can be handled by the owner and the auction committee, then the success of the project will increase.


Keywords


Design and build; procurement; risk factors; Construction Management; planning ability; implementation capability

Full Text:

PDF


DOI: https://doi.org/10.24815/jarsp.v1i2.10962

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Andi M. Tarigan, Abdullah Abdullah, Hafnidar A.Rani

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

__________________________________________________________________________________________________________________________________
Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).

Terakreditasi SINTA 4 Berdasarkan Surat Keputusan Direktur Jenderal Riset dan Pengembangan, Nomor: 10/C/C3/DT.05.00/2025

E-ISSN: 2615-1340 P-ISSN: 2620-7567 Organized by Program Studi Magister Teknik Sipil, Fakultas Teknik.

Published by Universitas Syiah Kuala.
Jurusan Teknik Sipil, Fakultas Teknik Universitas Syiah Kuala, Darussalam - Banda Aceh, 23111
Website: http://www.jurnal.usk.ac.id/JARSP/index
Email: jts.mts@usk.ac.id

 Creative Commons License

The Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
Published by Universitas Syiah Kuala is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://www.jurnal.usk.ac.id/JARSP/index

 

 VIEW STATS