FAKTOR SISA MATERIAL YANG MEMPENGARUHI BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH

Julsena Julsena, Abdullah Abdullah, Anita Rauzana

Abstract


The material has a large percentage of 50-70% of the total project cost. Good management can reduce the occurrence of excess material waste. The remaining material that has not been identified, will make the contractor does not know what percentage of losses caused by the remaining material in the project site. This study aims to identify the dominant factors causing the residual material, and to analyze the relationship and the influence of the remaining factors of material on the cost of building construction projects in Aceh Province. This study uses a mixed method, which combines qualitative and quantitative approaches through the distribution of questionnaires. Respondents addressed to the project manager of building contractor company with sub-field BG004 ranging from medium qualification (M1, M2), and large (B1). Based on the data of Construction Services Procurement Service (LPJK) in 2017 the number of contracting companies obtained as many as 215 companies, using Slovin formula then the research sample obtained as many as 68 companies. The sampling technique used is simple random sampling, randomly regardless of the strata present in the population. Of the 68 companies selected, construction costs range from Rp. 588,000,000 up to Rp. 30,251,965,000, with implementation period from 2010-2017. Data processing consists of validity, and reliability, while data analysis consists of descriptive analysis, simple correlation and multiple linear regression through Statistical Product and Service Solution (SPSS) version 22 software. The results show that the dominant remaining material factor that occurs during project implementation building construction in Aceh Province is a residual factor with a mean of 4.729. The design, procurement, handling and implementation factors have low correlation with Spearman coefficient of 0.260, 0.295, 0.373, and 0.296, while the residual factor has a very low correlation with Spearman coefficient of 0.130 to the cost of building construction projects in Aceh Province.


Keywords


Waste material; project cost; building; Aceh Province

Full Text:

PDF


DOI: https://doi.org/10.24815/jarsp.v1i4.12465

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 julsena julsena, Abdullah Abdullah, Anita Rauzana

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

__________________________________________________________________________________________________________________________________
Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).

Terakreditasi SINTA 3 Berdasarkan Surat Keputusan Direktur Jenderal Pendidikan Tinggi, Riset, dan Teknologi, Nomor: 158/E/KPT/2021.

E-ISSN: 2615-1340 P-ISSN: 2620-7567 Organized by Program Studi Magister Teknik Sipil, Fakultas Teknik.

Published by Universitas Syiah Kuala.
Jurusan Teknik Sipil, Fakultas Teknik Universitas Syiah Kuala, Darussalam - Banda Aceh, 23111
Website: http://www.jurnal.usk.ac.id/JARSP/index
Email: jts.mts@usk.ac.id

 Creative Commons License

The Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
Published by Universitas Syiah Kuala is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://www.jurnal.usk.ac.id/JARSP/index

 

 VIEW STATS