ANALISIS FAKTOR YANG MEMPENGARUHI RANTAI PASOK MATERIAL PROYEK PEMBANGUNAN GEDUNG DI KOTA SURAKARTA
Abstract
Keywords
Full Text:
PDFReferences
Adedeji, A. O., S., A. Y., & Oluwafikunmi, A. 2021. Web-based material requisition system in the supply chain of construction businesses. International Journal of Electrical and Computer Engineering (IJECE). 11(2), 1531. https://doi.org/10.11591/ijece.v11i2.pp1531-1538
Alfiani, A. 2015. Tinjauan Keterlambatan Pengiriman Parts Serta Klaim Pada PT United Tractors. Jurnal Logistik D III Transportasi UNJ. VIII(2), 37–40.
Alumbugu, P. O., Shakantu, W. W. M., & Tsado, A. J. 2020. Analysis of Outbound Logistics Channels for Construction Material. Journal of Engineering, Project, and Production Management. 10(1), 19–26. https://doi.org/10.2478/jeppm-2020-0003
Bertelsen, S. 2002. Bridging the gap–towards a comprehensive understanding of lean construction. IInternational Group for Lean Construction, 1–13.
http://www.bertelsen.org/strategisk_rådgivning_aps/pdf/Bridging the gaps - towards a comprehensive underatanding of lean construction.pdf
Bhardwaj, A., Iyer, S. R., Ramesh, S., White, J., & Subramanian, L. 2023. Understanding sudden traffic jams: From emergence to impact. Development Engineering. 8, 100–105. https://doi.org/10.1016/j.deveng.2022.100105
Chen, J., Zhong, J., & Xie, B. 2021. Research on System Dynamics Simulation of Building Materials Supply Chain. Journal of Physics: Conference Series. 1865(4), 042120. https://doi.org/10.1088/1742-6596/1865/4/042120
Chen, P. H., & Nguyen, T. C. 2019. A BIM-WMS integrated decision support tool for supply chain management in construction. Automation in Construction. 98 (December 2018), 289–301. https://doi.org/10.1016/j.autcon.2018.11.019
Darmanto, B., Widjayakusuma, J., & Simanjuntak, M. R. A. 2020. Identifikasi Faktor-Faktor Yang Menyebabkan Cost Overrun Pada Konstruksi Gedung Bertingkat. Prosiding Seminar Nasional Teknik Sipil 2020, 334–342.
Dewi, R. M., Indrayadi, M., Teknik, J., Fakultas, S., Universitas, T., Pontianak, T., Teknik, D., Universitas, S., & Pontianak, T. 2022. Perencanaan Dan Pengendalian Bahan Material Pada Proyek Penggantian Jembatan Ruas Jalan Kota Mempawah - Sui Pinyuh – Batas Kota Pontianak. Jurnal PWK, Laut, Sipil, Tambang. 9(3), 1–9.
Dwivedi, D. N. 2023. The Use of Artificial Intelligence in Supply Chain Management and Logistics. 306–313. https://doi.org/10.4018/979-8-3693-1902-4.ch018
Dwivedi, D. N. 2024. The Use of Artificial Intelligence in Supply Chain Management and Logistics. In D. Sharma, B. Bhardwaj, & M. C. Dhiman (Eds.), Leveraging AI and Emotional Intelligence in Contemporary Business Organizations. 306–313. IGI Global.
https://doi.org/https://doi.org/10.4018/979-8-3693-1902-4.ch018
Evans, W. 2006, June 19. Logistics and Supply Chain Management - A Space Operations Enabler. SpaceOps 2006 Conference. https://doi.org/10.2514/6.2006-5852
Farooq, S. A., Indhu, B., & Jagannathan, P. 2023. Impact of covid-19 on supply chain management in construction industry in Kashmir. Asian Journal of Civil Engineering. 24(2), 429–438. https://doi.org/10.1007/s42107-022-00509-w
Fatorachian, H., & Kazemi, H. 2021. Impact of Industry 4.0 on supply chain performance. The Management of Operations. 32(1), 63–81.
Gauri, H., & M.C.Aher. 2021. Construction Supply Chain Management and Organizational Performance in Construction Projects. IEI Conferences. 11. https://doi.org/10.36375/prepare_u.iei.a117
Ghadge, A., Wurtmann, H., & Seuring, S. 2020. Managing climate change risks in global supply chains: a review and research agenda. International Journal of Production Research. 58(1), 44–64. https://doi.org/10.1080/00207543.2019.1629670
Guetterman, T. C. 2019. Basics of statistics for primary care research. Family Medicine and Community Health. 7(2), e000067. https://doi.org/10.1136/fmch-2018-000067
Gunasekaran, A., Patel, C., & McGaughey, R. E. 2004. A framework for supply chain performance measurement. International Journal of Production Economics. 87(3), 333–347. https://doi.org/10.1016/j.ijpe.2003.08.003
Gunawan, A. S., Sipayung, E. M., & Wiguno, A. 2015. Pengiriman Barang Dengan Metode Ant Colony Optimization Studi Kasus: PT . XYZ. Seminar Nasional Sistem Informasi Indonesia 2015, 477–482.
Hanh, N. T. M., Toan, N. Q., & Thanh, P. Q. 2024. Factors affecting the cooperative relationships in material supply chain of construction enterprises. Organization, Technology and Management in Construction: An International Journal. 16(1), 38–51. https://doi.org/10.2478/otmcj-2024-0003
Hariani, D., & Ramdany, M. 2022. Pengaruh Perencanaan, Quality Control Dan Evaluasi Kinerja Manajemen Logistik Terhadap Ketepatan Waktu Pengiriman Barang Pada PT. ID. Express Logistik Indonesia, Gudang Depok. Jurnal Ilmiah Indonesia. 7(11), 15392–15.
Hartono, W., & Kusnianto, A. N. 2023. Supply chain of construction materials on building construction projects in Banjarmasin. AIP Conference Proceedings. 2629(1). https://doi.org/10.1063/5.0129151
Hatmoko, J. U. D., & Kistiani, F. 2017. Model Simulasi Risiko Rantai Pasok Material Proyek Konstruksi Gedung. Media Komunikasi Teknik Sipil. 23(1), 1. https://doi.org/10.14710/mkts.v23i1.14697
Hawari, R. A., Oktaviani, C. Z., & Nurisra, N. 2021. Komposisi Biaya Sumber Daya Material dan Tenaga Kerja Pada Proyek Konstruksi Bangunan Gedung Sederhana. Journal of The Civil Engineering Student. 3(2), 148–154. https://doi.org/10.24815/journalces.v3i2.14448
Jenlina. 2013. Desain Risk Management Untuk Rantai Pasok PT. X. Calyptra. 2(2), 1–19.
Jin, O. F., Hutabarat, L. E., & Andri. 2022. Analisis Faktor-Faktor yang Mempengaruhi Waktu Tunggu Pengadaan Material Beton Pada Beberapa Proyek di Jakarta. Jurnal Rekayasa Teknik Sipil Dan Lingkungan. 3(2), 91–98.
Kar, S., & Jha, K. N. 2020. Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences. Journal of Construction Engineering and Management. 146(9). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001906
Karundeng, T. N., Mandey, S. L., & Sumarauw, J. S. B. 2018. Analisis Saluran Distribusi Kayu (Studi Kasus Di CV. Karya Abadi, Manado). Jurnal EMBA. 6(3), 1748–1757.
Kini, D. U. 1999. Materials Management: The Key to Successful Project Management. Journal of Management in Engineering. 15(1), 30–34. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:1(30)
Kumar, U. N. 2018. Construction Material Management on Project Sites. International Journal for Research in Applied Science and Engineering Technology. 6(1), 1371–1378. https://doi.org/10.22214/ijraset.2018.1207
Kurniawan, H., & Anggraeni, I. A. A. 2020. Analisis Risiko Rantai Pasok Material Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi. Jurnal Rekayasa Sipil. 14(1), 43–50.
https://doi.org/10.21776/ub.rekayasasipil.2020.014.01.6
Li, Z., Li, G., Zhang, Y., Chen, J., & Dai, Y. 2019. Risk Early Warning Model for Distribution Network Material Supply Chain of Electric Power Enterprises. 2019 12th International Conference on Intelligent Computation Technology and Automation (ICICTA). 700–707.
https://doi.org/10.1109/ICICTA49267.2019.00154
Marioga, S., Latupeirissa, J. E., & Meti. 2021. Faktor – Faktor Penyebab Keterlambatan Pada Pekerjaan Pile cap (Studi Kasus : Proyek Upgrade Trans Studio Mall Makassar). Paulus Civil Engineering Journal. 3(3), 321–329.
Martínez, C., Paraskevas, J. P., Grimm, C., Corsi, T., & Boyson, S. 2020. The Impact of Environmental Risks in Supply Chain Resilience. In Supply Chain Management and Logistics in Emerging Markets. 11–39. Emerald Publishing Limited. https://doi.org/10.1108/978-1-83909-331-920201002
Mudita, P. K., Sudarsana, I. K., & Nadiasa, M. 2016. Analisis Faktor-Faktor Yang Mempengaruhi Waktu Tunggu Pengadaan Material Konstruksi Pada Proyek Gedung Di Kabupaten Badung. Jurnal Spektran. 4(2), 18–26.
Nansi, M. R. 2022. Analisis Faktor-Faktor Yang Mempengaruhi Keputusan (Studi Kasus Pada DPL Translogistics). Jurnal Ekonomi Dan Bisnis. 9(2), 317–324.
Oteng, M., Opoku, O. A., & Gyamfi, E. 2022. The Effect of Road Traffic on Supply Chain Performance of Kwasi Oppong Company Limited in Ghana. Journal of Production, Operations Management and Economics. 21, 27–36. https://doi.org/10.55529/jpome.21.27.36
Prokop, D. J. 2022. Chapter 3 - Transportation and supply chain management (D. J. B. T.-T. O. M. Prokop (ed.). 55–79. Elsevier. https://doi.org/https://doi.org/10.1016/B978-0-12-815415-1.00010-0
Puteri, L. A. L., Dhiu, C. H., Soeharto, M. E., & Purba, H. H. 2022. Analisis Risiko Cost Overrun (Pembengkakan Biaya) Pada Proyek Konstruksi: Kajian Literatur. Jurnal Rekayasa Sipil Dan Lingkungan. 5(2), 184–201.
Qian, Y., Yu, X., Shen, Z., & Song, M. 2023. Complexity analysis and control of game behavior of subjects in green building materials supply chain considering technology subsidies. Expert Systems with Applications. 214, 119052. https://doi.org/10.1016/j.eswa.2022.119052
Rainer, R. K., Prince, B., & Cegielski, C. G. 2015. Introduction to Information Systems: Supporting and Transforming Business (4th ed.). John Wiley & Sons.
Sasongko, D. U. 2020. Studi Pola Rantai Pasok Material Bambu Pada Proyek Konstruksi di Sukabumi. Jurnal Student Teknik Sipil. 2(3), 235–243. https://doi.org/10.37150/jsts.v2i3.1300
Shin, T.-H., Yoon, S.-W., & Chin, S. 2012. A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment. Journal of Construction Engineering and Project Management. 2(4), 11–19. https://doi.org/10.6106/JCEPM.2012.2.4.011
Soekiman, A. P., & Soekiman, A. 2021. Analisis Faktor Penyebab Cost Overruns Pada Proyek Konstruksi Pembangunan Rumah Dan Ruko Di Kota Bandung Dan Cimahi. Jurnal Rekayasa Sipil. 17(1), 13–23.
Srinivas, S., Ganesha, H.R. 2024. Covid-19 Pandemic’s Impact On Logistics And Supply Chain Industry. EPRA International Journal of Multidisciplinary Research (IJMR). 10(1), 27–34. https://doi.org/10.36713/epra15365
Taak, A., & Kumar, R. 2019. Supply Chain Issues and Challenges for Cement Industries of India: A Case Study. 297–302. https://doi.org/10.1007/978-981-13-6412-9_27
Utama, A. W. 2018. Analisis Faktor-Faktor Yang Mempengaruhi Penundaan Pengiriman Barang Melalui Jalur Laut. Jurnal Citra Widya Edukasi. 10(2), 97–108.
Vrijhoef, R. 2020. Lean Construction, Core Concepts and New Frontiers (P. Tzortzopoulos, M. Kagioglou, & L. Koskela (eds.). 1st Edition. Routledge. https://doi.org/https://doi.org/10.1201/9780429203732
Waters, D. 2003. Logistics: an introduction to supply chain management. In Palgrave Macmillan. 4(1). Palgrave Macmillan.
Wei, L., & Yi-zhong, M. 2013. A framework for using six-sigma metrics to evaluate the performance of supply chain. International Conference on Management Science and Engineering 20th Annual Conference Proceedings. 664–669.
Xu, J., Jia, R., Wang, B., Xu, A., & Zhu, X. 2023. The Optimal Emission Reduction and Recycling Strategies in Construction Material Supply Chain under Carbon Cap–Trade Mechanism. Sustainability. 15(12), 9181. https://doi.org/10.3390/su15129181
Yang, J., & Guo, L. 2020. Optimization of Marine Port Logistics Collection and Distribution Network: A Perspective of Supply Chain Management. Journal of Coastal Research, 106(sp1), 473-476. https://doi.org/10.2112/SI106-106.1
Yu, L. 2024. Automobile Transportation Logistics Supply Chain Management Strategy. Proceedings of Business and Economic Studies. 7(1), 56–61. https://doi.org/10.26689/pbes.v7i1.6078
Yun, N. Y., & Ülkü, M. A. 2023. Sustainable Supply Chain Risk Management in a Climate-Changed World: Review of Extant Literature, Trend Analysis, and Guiding Framework for Future Research. Sustainability. 15(17), 13199. https://doi.org/10.3390/su151713199
Zhou, C., Fan, H., & Jiang, W. 2011. A model for supply chain logistics cost management based on analytic hierarchy process. 2011 International Conference on Business Management and Electronic Information. 269–273. https://doi.org/10.1109/ICBMEI.2011.5914475
DOI: https://doi.org/10.24815/jarsp.v7i3.30487
Article Metrics
Abstract view : 0 timesPDF - 0 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Widi Hartono
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
__________________________________________________________________________________________________________________________________
Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
E-ISSN: 2615-1340 P-ISSN: 2620-7567 Organized by Program Studi Magister Teknik Sipil, Fakultas Teknik.
Published by Universitas Syiah Kuala.
Jurusan Teknik Sipil, Fakultas Teknik Universitas Syiah Kuala, Darussalam - Banda Aceh, 23111
Website: http://www.jurnal.usk.ac.id/JARSP/index
Email: jts.mts@usk.ac.id
The Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
Published by Universitas Syiah Kuala is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://www.jurnal.usk.ac.id/JARSP/index