METODE PENJADWALAN M-PERT SEBAGAI ALTERNATIF SOLUSI AKURASI ESTIMASI WAKTU PROYEK (REVIEW)

Reza Ashadi, Albert Eddy Husin

Abstract


Delay in project completion is the most common problem in the construction industry worldwide. Many things cause this to happen, mainly because of lack of accurate scheduling planning. One of the most common and widely used methods is PERT. However, conventional PERT method ignores the calculation of path duration other than the critical path. This causes a bias in calculating the total project time. This paper intends to introduce the M-PERT scheduling method developed by Pablo Ballesteros-Perez, where this method is a development of conventional PERT method which combines all existing pathways into one combined path. This M-PERT method is enough to use manual calculations without using computer-based simulations or certain software. Several case examples are used to facilitate better understanding of this M-PERT method. The accuracy of the M-PERT method has also improved.  This can be seen with a case study example comparing the PERT and M-PERT methods.  As a reference value, the Standard Normal Distribution is used. From the results of the M-PERT method calculations for the case study example, the average total duration (mean) of the project  and the standard deviation of the project were obtained .  Meanwhile, using the PERT method, we obtained   and . From the calculations using MS-Excel software, it was found that the project duration in the case study example using the conventional PERT method had an error of about 14%, while using the M-PERT method, the error was about 2%.

Keywords


Estimated accuracy; M-PERT; Project time estimation; Project completion delay

Full Text:

PDF

References


Adegoke, A.S. 2011. Measuring Process Effectiveness Using CPM / PERT. International Journal of Bussiness and Management. 6(6), 286-295. https://doi.org/10.5539/ijbm.v6n6p286

Aribisala, A., Otenaike, A., Balogun, O., Ofusori, L. 2017. Analysis of an Engineering Project Using Program Evaluation and Review Technique. FUOYE Journal of Engineering and Technology. 2(1), 9-12. https://doi.org/10.46792/fuoyejet.v2i1.49

Ballesteros-Pérez, P., 2017. M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of construction engineering and management. 143(9), 04017063.

Habibi, F., Birgani, O., Koppelaar, H. and Radenović, S. 2018. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT). Journal of Project Management. 3(4), 183-196. http://dx.doi.org/10.5267/j.jpm.2018.4.002

Herrerías-Velasco, J.M., Herrerías-Pleguezuelo, R., Van Dorp, J. R.. 2011. Revisiting the PERT mean and variance. European Journal of Operational Research. 210(2), 448-451. https://doi.org/10.1016/j.ejor.2010.08.014

Kholil, M., Alfa, B.N., Hariadi, M. 2018. Scheduling of house development projects with CPM and PERT method for time efficiency (Case study: House type 36). IOP Conference Series: Earth and Environmental Science. 140(1), 012010. https://doi.org/10.1088/1755-1315/140/1/012010

Malcolm, D.G., Roseboom, J.H., Clark, C.E., Fazar, W. 1959. Application of A Technique For Research And Development Program Evaluation. Operations research. 7(5), 646-669.

Matthews, P. 2016. “This Is Why Construction Is So Corrupt”. Available: https://www.weforum.org/agenda/2016/02/why-is-the-construction-industry-so-corrupt-and-what-can-we-do-about-it/




DOI: https://doi.org/10.24815/jarsp.v8i1.37407

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Reza Ashadi

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

__________________________________________________________________________________________________________________________________
Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).

Terakreditasi SINTA 3 Berdasarkan Surat Keputusan Direktur Jenderal Pendidikan Tinggi, Riset, dan Teknologi, Nomor: 158/E/KPT/2021.

E-ISSN: 2615-1340 P-ISSN: 2620-7567 Organized by Program Studi Magister Teknik Sipil, Fakultas Teknik.

Published by Universitas Syiah Kuala.
Jurusan Teknik Sipil, Fakultas Teknik Universitas Syiah Kuala, Darussalam - Banda Aceh, 23111
Website: http://www.jurnal.usk.ac.id/JARSP/index
Email: jts.mts@usk.ac.id

 Creative Commons License

The Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
Published by Universitas Syiah Kuala is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://www.jurnal.usk.ac.id/JARSP/index

 

 VIEW STATS