ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI METODE PELAKSANAAN PEMBANGUNAN PROYEK KOTA BANDA ACEH (STUDI KASUS: PEMBANGUNAN GEDUNG KULIAH TERPADU UIN AR-RANIRY BANDA ACEH)

Aldina Fatimah, Roni Agusmaniza, Alifaqil Sulthan, Aulia Rahman, Akmal Akmal, Alvisyahri Alvisyahri

Abstract


The success of a project heavily depends on the various parties involved in its implementation process, such as the project owner, contractor, and supervising consultant. These three parties must maintain quality and quantity to ensure the planned project can be completed successfully. Contractors, as implementers, must have good management in organizing and coordinating their company as well as fieldwork. This is important to minimize risks that can directly impact the project's implementation methods during construction. This study aims to identify the factors influencing project implementation methods, particularly in the construction of the Integrated Lecture Building at UIN Ar-Raniry Banda Aceh. The benefits of this research are to provide information on the main factors affecting the implementation methods of constructing integrated lecture buildings using the Principal Component Analysis (PCA) method. The research was conducted by distributing questionnaires to 50 respondents, including project owners, contractors, consultants, and project workers. Based on the factor analysis results using PCA, seven influential factors were identified. These factors are project management and contracts, with a variance percentage of 46.794%, natural conditions (8.640%), planning (7.215%), field operations (4.757%), schedule and time (4.172%), equipment and human resources (3.911%), and work methods (3.259%). Among these, project management and contracts are the most dominant factors, with eigenvalues of 17.782. The most influential indicator on the first factor is the lack of coordination between the supervising consultant and the contractor, with a factor loading value of 0.833. These factors are the results of transforming the initial correlated factors into new uncorrelated factors, producing a smaller dimension while explaining most of the variance of the original factors

Keywords


Building; Implementation methods; Construction project; PCA

Full Text:

PDF

References


Baroroh, A. 2013. Analisis Multivariat dan Time series dengan SPSS 21. Elex Media Komputindo, Jakarta.

Damayanti, Y. A., Sitompul, M. 2021. Analisis Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Pembangunan Jalan Tol Ruas Binjai-Langsa Seksi Binjai-Pangkalan Brandan. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). 4(2), 153–163.

https://doi.org/10.54367/jrkms.v4i2.1386

Dimyati, A. H., Nurjaman, K. 2014. Manajemen Proyek. Cetakan pertama. CV. Pustaka Setia.

Errida, A., Lotfi, B. 2021. The Determinants Of Organizational Change Management Success: Literature Review And Case Study. International Journal of Engineering Business Management. 13, 1–15. https://doi.org/10.1177/18479790211016273

Ervianto, W. I. 2005. Manajemen Proyek Konstruksi Edisi Revisi. Andi, Yogyakarta.

Ervianto, W. I. 2023. Manajemen Proyek Konstruksi. Andi, Yogyakarta.

Fatimah, A., Hidayat, R., Maulana, I. 2024. Kajian Pengaruh Penerapan Rantai Pasok Material Terhadap Kesuksesan Proyek Konstruksi Di Kota Banda Aceh. Jurnal Arsip Rekayasa Sipil dan Perencanaan. 7(2), 132-141. https://jurnal.usk.ac.id/JARSP/article/view/38581

Gerry, Pokay, J., K, A., Dundu, T., SIbi, M. 2020. Metode Pelaksanaan Konstruksi Pekerjaan Bagian Bawah Jembatan Lalow Kabupaten Bolaang Mongondow Provinsi Sulawesi Utara. Jurnal Sipil Statik. 8(3), 443–452.

Herman, I. 2019. Metodologi Penelitian Pendidikan (Kualitatif, Kuantitatif Dan Mixed Methode). Hidayatul Quran.

Indrajad, R. D. 2019. Analisis Pengaruh Manajemen Konstruksi Terhadap Kesuksesan Operasional Proyek di Kabupaten Sleman dan Kota Madya Yogyakarta. Skripsi, Institut Teknologi Nasional Yogyakarta, Indonesia.

Nurhidayat, A., Arianto, B., Bhirawa, W. T. 2021. Optimalisasi Pembangunan Proyek Apartemen Sgc Cibubur Dengan Menggunakan Metode Precedence Diagram Method (PDM). Jurnal Teknik Industri. 10(1), 22-31. https://doi.org/10.35968/jtin.v10i1.706

Prihantoro, B., Aulia, H. I. 2019. Analisis Faktor-Faktor Yang Mempengaruhi Metode Pelaksanaan Pembangunan Gedung Apartemen Di Semarang. Skripsi, Universitas Semarang, Indonesia.

Radiarta, I. N., Hasnawi, H., Mustafa, A. 2014. Kondisi Kualitas Perairan Di Kabupaten Morowali Provinsi Sulawesi Tengah: Pendekatan Spasial dan Statistik Multivariat. Jurnal Riset Akuakultur. 8(2), 299-309.

Rani, H. A. 2016. Manajemen Proyek Konstruksi. Deepublish, Yogyakarta.

Sanaky, M. M. 2021. Analisis Faktor-Faktor Keterlambatan Pada Proyek Pembangunan Gedung Asrama Man 1 Tulehu Maluku Tengah. Jurnal Simetrik. 11(1), 432–439. https://doi.org/10.31959/js.v11i1.615

Hase, N., Maizuar, M., Jalil, A. 2024. Risiko Cost Overrun Dalam Pelaksanaan Proyek Konstruksi Gedung Di Provinsi Aceh. Jurnal Arsip Rekayasa Sipil dan Perencanaan. 7(1), 53–62.

https://doi.org/10.24815/jarsp.v7i1.36823

Sugiyono, S. 2011. Metode Penelitian Kuantitatif Kualitatif dan R&D. Alfabeta, Bandung.

Tabrani, N., Mulia, A. P., Anas, R., Utara, U. S., Konstruksi, P. 2023. Analisis Faktor Keterlambatan Pelaksanaan Proyek Jembatan Di Provinsi Sumatera Utara. 4(1), 119–133.

https://doi.org/10.46799/jst.v4i1.687

Widjajanto, T., Perdana, S., Rahman, A. 2019. Pelatihan Manajemen Proyek Dengan Metode CPM (Critical Path Method) Di PT. Niromukti Airtech Indonesia. Lakar: Jurnal Arsitektur. 2(2), 105-110.

http://dx.doi.org/10.30998/lja.v2i2.5357

Yuliana, C. 2013. Analisis Faktor Penyebab Terjadinya Keterlambatan Pada Pelaksanaan Proyek Pembangunan Jembatan. INFO-TEKNIK. 14(2), 114–125.




DOI: https://doi.org/10.24815/jarsp.v7i4.41910

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Aldina Fatimah, Roni Agusmaniza, Alifaqil Sulthan, Aulia Rahman, Akmal Akmal

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

__________________________________________________________________________________________________________________________________
Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).

Terakreditasi SINTA 3 Berdasarkan Surat Keputusan Direktur Jenderal Pendidikan Tinggi, Riset, dan Teknologi, Nomor: 158/E/KPT/2021.

E-ISSN: 2615-1340 P-ISSN: 2620-7567 Organized by Program Studi Magister Teknik Sipil, Fakultas Teknik.

Published by Universitas Syiah Kuala.
Jurusan Teknik Sipil, Fakultas Teknik Universitas Syiah Kuala, Darussalam - Banda Aceh, 23111
Website: http://www.jurnal.usk.ac.id/JARSP/index
Email: jts.mts@usk.ac.id

 Creative Commons License

The Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
Published by Universitas Syiah Kuala is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://www.jurnal.usk.ac.id/JARSP/index

 

 VIEW STATS