EVALUATION OF THE PRICE WEIGHTING OF WINNERS OF PROCUREMENT OF GOODS AND SERVICES IN PUBLIC PROJECTS
Abstract
Full Text:
PDFReferences
Abdullah, R., Anggraini, R. and Isya, M. (2022) ‘Analisis faktor risiko dalam pelaksanaan proyek konstruksi jalan di provinsi aceh menurut persepsi kontraktor menengah’, Jurnal Arsip Rekayasa Sipil dan Perencanaan, 5(3), pp. 190–200.
Available at: http://www.jurnal.unsyiah.ac.id/JARSP/index%0APENGARUH.
Acheamfour, V.K. and Kissi, E. (2019) ‘Review of empirical arguments on contractor pre-quali fi cation criteria’, journal of Engineering Design and Technology, (March 2020), pp. 1–15. Available at: https://doi.org/10.1108/JEDT-03-2019-0067.
Acheamfour, V.K. and Kissi, E. (2021) ‘Contractor selection : a review of qualification and pre-qualification systems’, International Journal of Construction Management, 0(0), pp. 1–22. Available at: https://doi.org/10.1080/15623599.2020.1868092.
Almohassen, A.S. et al. (2023) ‘Evaluating construction contractors in the pre-tendering stage through an integrated based model’, Alexandria Engineering Journal, 82(July), pp. 437–445. Available at: https://doi.org/10.1016/j.aej.2023.09.069.
Arifin, Z. and Juwanti, D. (2013) ‘Study of bid prices and determining factors of tender winners’, in Konferensi Nasional Teknik Sipil 7 (KoNTekS 7). Solo: UNS, pp. 24–26.
Aziz, R.F. and Aboelmagd, Y.M. (2019) ‘Integration between different construction bidding models to improve profitability and reduce prices’, Alexandria Engineering Journal, 58(1), pp. 151–162. Available at: https://doi.org/10.1016/j.aej.2018.10.007.
El, A.A. and Khalifa, M. (2014) ‘Factors influencing sub-contractors selection in construction projects’, HBRC Journal, 9(2), pp. 150–158. Available at: https://doi.org/10.1016/j.hbrcj.2013.05.001.
Fawale, T.S. (2017) ‘Impact of Contractors ’ Bidding Strategies on Bid Success in the Nigeria Construction Industry’, International Journal Of Built Environment And Sustainability, 4(1), pp. 23–27. Available at: https://doi.org/10.11113/ijbes.v4.n1.156.
Hasnain, M. (2017) ‘Best Value Contractor Selection in Road Construction Projects : ANP-Based Decision Support System’, International Journal of Civil Engineering, 0(0), p. 0. Available at: https://doi.org/10.1007/s40999-017-0199-2.
Khan, T.H. and Khan, A.Q. (2015) ‘Effects of Lowest Bidding Bid Awarding System In Public Sector Construction Projects In Pakistan’, Global Journal of Management and Business Research: G Interdisciplinary, 15(1), pp. 132–146.
Khoso, A.R. et al. (2020) ‘Decision Criteria For Assessment Of Contractors In Prequalification Phase Of Public Projects’, International Journal of Advanced Science and Technology, 29(August), pp. 2624–2635.
Mardiaman (2020) ‘Determining Weight Criteria/ Sub-Criteria In Selecting Public Construction Work Contractor’, Palarch’s Journal Of Archaeology Of Egypt/Egyptology, 17(9), pp. 9485–9495. Available at: https://archives.palarch.nl/index.php/jae/article/view/5910/5786.
Mardiaman (2024) Metodologi Penelitian. 1st edn. Jogyakarta: Penerbit KBM Indonesia.
Mardiaman and Indriasari (2021) ‘Faktor-Faktor Penentu Utama Keterlambatan Pada Pekerjaan Konstruksi Pabrik ( Studi Kasus : Pabrik Kawasan Cikarang )’, e-Journal CENTECH 2020, 2(1), pp. 1–11. Available at: http://ejournal.uki.ac.id/index.php/cen.
Rashid, I. et al. (2018) ‘Contractor selection criteria: A study on Malaysian public construction projects’, International Journal of Engineering and Technology(UAE), 7(3), pp. 65–70. Available at: https://doi.org/10.14419/ijet.v7i3.25.17471.
Shachat, J. and Tan, L. (2023) ‘How Auctioneers Set Reserve Prices in Procurement Auctions’, European Journal of Operational Research, 304(2), pp. 709–728.
Available at: https://doi.org/10.1016/j.ejor.2022.04.025.
Shukery, N.M. et al. (2019) ‘Selection of Contractor : a Flexible Performance-Based Approach’, 7(3), pp. 338–344.
Suci, S.N., Cendekiawan, M. and Firmansyah, A. (2024) ‘Berhasilkah Implementasi Pengadaan Publik Berkelanjutan Di Indonesia ?’, Jurnalku, 4(1), pp. 36–49.
Syaiful, A.R.I. and Arifin, R. (2020) ‘Analisis Pelaksanaan E-Tendering Jasa Konstruksi’, journal of civil Engineering and Vocational Education, 7(1), pp. 36–43.
Available at: http://ejournal.unp.ac.id/index.php/cived/index%0Aanalisis.
Tanubrata, M. and Setiaputri, M. (2010) ‘Proses Evaluasi Penawaran Kontraktor ( Merit Point System)’, Jurnal Teknik Sipil, 6(2), pp. 79–100.
Zuhri, Isya, M. and Rani, H.A. (2018) ‘Pengaruh Faktor-Faktor Kualifikasi Kontraktor’, Jurnal Arsip Rekayasa Sipil dan Perencanaan 1(3):113-121, 1(3), pp. 113–121. Available at: https://doi.org/10.24815/jarsp.v1i1.11775.
DOI: https://doi.org/10.24815/jarsp.v8i2.44243
Article Metrics
Abstract view : 39 timesPDF - 21 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Mardi aman, Indriasari Indriasari

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
__________________________________________________________________________________________________________________________________
Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
E-ISSN: 2615-1340 P-ISSN: 2620-7567 Organized by Program Studi Magister Teknik Sipil, Fakultas Teknik.
Published by Universitas Syiah Kuala.
Jurusan Teknik Sipil, Fakultas Teknik Universitas Syiah Kuala, Darussalam - Banda Aceh, 23111
Website: http://www.jurnal.usk.ac.id/JARSP/index
Email: jts.mts@usk.ac.id
The Jurnal Arsip Rekayasa Sipil dan Perencanaan (Journal of Archive in Civil Engineering and Planning).
Published by Universitas Syiah Kuala is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://www.jurnal.usk.ac.id/JARSP/index







