Optimalisasi Penempatan dan Besaran Shunt Capacitor pada Fasilitas Interkoneksi Generator Distribusi (Studi Kasus di PT PLN (Persero) Rayon Dolok Sanggul)
Abstract
The existence of distributed generation (DG) has improved voltage regulation, but it reverses power factor and network losses on Dolok Sanggul distribution system. The operation scheme and the lenght of interconnection facility of DG have caused the increase reactive power flow on distribution system. The increase in reactive power flow could be compensated by the installment of shunt capacitor. Optimal Capacitor Placement ETAP Power Station with the objective function is to minimize the cost of distribution system was used to search the placement and the size of shunt capacitor in the interconnection facility of DG. After the installment of shunt capacitor, the cost of distribution system can be saved Rp 2,092,403,071,- (US$ 152,208) in Peak Load Time (WBP) and Rp 8,390,300,625,- (US$ 610,337) in Outside Peak Load Time (LWBP) in the five-year period.
Keywords
Distribution Generator; Shunt Capacitor; Optimal Capacitor Placement; Power Factor; Distribution Network Losses
Full Text:
PDFDOI: https://doi.org/10.17529/jre.v12i1.3094
Article Metrics
Abstract view : 0 timesPDF - 0 times
Refbacks
- There are currently no refbacks.
View My Stats
Jurnal Rekayasa Elektrika (JRE) is published under license of Creative Commons Attribution-ShareAlike 4.0 International License.