IDENTIFIKASI FAKTOR COST OVERRUN PADA PROYEK KONSTRUKSI DI NEGARA-NEGARA BERKEMBANG
Abstract
Keywords
Full Text:
PDFReferences
S. Famiyeh, C. T. Amoatey, E. Adaku, and C. S. Agbenohevi, “Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana,” J. Eng. Des. Technol., vol. 15, no. 2, pp. 181–198, 2017, doi: 10.1108/JEDT-11-2015-0075.
S. S. Uvarova, S. V. Belyaeva, A. K. Orlov, and V. S. Kankhva, “Cost Forecasting for Building Materials under Conditions of Uncertainty: Methodology and Practice,” Buildings, vol. 13, no. 9, pp. 1–26, 2023, doi: 10.3390/buildings13092371.
R. F. Herrera, O. Sánchez, K. Castañeda, and H. Porras, “Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis,” Appl. Sci., vol. 10, no. 16, 2020, doi: 10.3390/app10165506.
S. Durdyev, “Review of construction journals on causes of project cost overruns,” Eng. Constr. Archit. Manag., vol. 28, no. 4, pp. 1241–1260, 2020, doi: 10.1108/ECAM-02-2020-0137.
R. Susanti, “Cost overrun and time delay of construction project in Indonesia,” J. Phys. Conf. Ser., vol. 1444, no. 1, 2020, doi: 10.1088/1742-6596/1444/1/012050.
H. Samarghandi, S. M. M. Tabatabaei, P. Taabayan, A. M. Hashemi, and K. Willoughby, “Studying the reasons for delay and cost overrun in construction projects: The case of Iran,” J. Constr. Dev. Ctries., vol. 21, no. 1, pp. 51–84, 2016, doi: 10.21315/jcdc2016.21.1.4.
C. D. Annamalaisami and A. Kuppuswamy, “Reckoning construction cost overruns in building projects through methodological consequences,” Int. J. Constr. Manag., vol. 22, no. 6, pp. 1079–1089, 2022, doi: 10.1080/15623599.2019.1683689.
P. E. D. Love, C. P. Sing, X. Wang, Z. Irani, and D. W. Thwala, “Overruns in transportation infrastructure projects,” Struct. Infrastruct. Eng., vol. 10, no. 2, pp. 141–159, 2014, doi: 10.1080/15732479.2012.715173.
S. Melaku Belay, S. Tilahun, M. Yehualaw, J. Matos, H. Sousa, and E. T. Workneh, “Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia,” Adv. Civ. Eng., vol. 2021, 2021, doi: 10.1155/2021/4991204.
T. Huo et al., “Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong,” J. Constr. Eng. Manag., vol. 144, no. 3, pp. 1–10, 2018, doi: 10.1061/(asce)co.1943-7862.0001444.
R. M. Johnson and R. I. I. Babu, “Time and cost overruns in the UAE construction industry: a critical analysis,” Int. J. Constr. Manag., vol. 20, no. 5, pp. 402–411, 2020, doi: 10.1080/15623599.2018.1484864.
I. Mahamid, “Study of relationship between cost overrun and labour productivity in road construction projects,” Int. J. Product. Qual. Manag., vol. 24, no. 2, pp. 143–164, 2018, doi: 10.1504/IJPQM.2018.091791.
G. A. Niazi and N. Painting, “Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan,” Procedia Eng., vol. 182, pp. 510–517, 2017, doi: 10.1016/j.proeng.2017.03.145.
A. França and A. Haddad, “Causes of construction projects cost overrun in Brazil,” Int. J. Sustain. Constr. Eng. Technol., vol. 9, no. 1, pp. 69–83, 2018, doi: 10.30880/ijscet.2018.09.01.006.
N. Al-Hazim, Z. A. Salem, and H. Ahmad, “Delay and Cost Overrun in Infrastructure Projects in Jordan,” Procedia Eng., vol. 182, pp. 18–24, 2017, doi: 10.1016/j.proeng.2017.03.105.
S. Idrees and M. T. Shafiq, “Factors for Time and Cost Overrun in Public Projects,” J. Eng. Proj. Prod. Manag., vol. 11, no. 3, pp. 243–254, 2021, doi: 10.2478/jeppm-2021-0023.
M. Aslam, E. Baffoe-Twum, and F. Saleem, “Design Changes in Construction Projects – Causes and Impact on the Cost,” Civ. Eng. J., vol. 5, no. 7, pp. 1647–1655, 2019, doi: 10.28991/cej-2019-03091360.